{"id":31256,"date":"2017-08-10T21:16:01","date_gmt":"2017-08-10T21:16:01","guid":{"rendered":"http:\/\/www.maxconstruction.qc.ca\/permis-travaux-etapes-administratives-renovations\/"},"modified":"2021-12-23T14:47:05","modified_gmt":"2021-12-23T14:47:05","slug":"works-permit-the-administrative-steps-before-renovations","status":"publish","type":"post","link":"https:\/\/www.maxconstruction.qc.ca\/en\/works-permit-the-administrative-steps-before-renovations\/","title":{"rendered":"Works permit : the administrative steps before renovations"},"content":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221;][et_pb_row admin_label=&#8221;row&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; background_size=&#8221;initial&#8221;][et_pb_column type=&#8221;4_4&#8243;][et_pb_text background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; background_size=&#8221;initial&#8221; _builder_version=&#8221;3.3.1&#8243;]<\/p>\n<p>Depending on the size of the project, it may be necessary to obtain a works permit before starting the renovation of his house. In Quebec, the steps are taken with the municipality. A procedure that you can follow yourself or delegate to your contractor.<\/p>\n<h3>Have plans and estimates ready<\/h3>\n<p>As the application for a permit must be accompanied by plans and an estimate of the cost of the works, it is essential to define a clear project, to have corresponding plans and to obtain an evaluation of the works in order to have all the information and documents that must be attached to a permit application.<\/p>\n<h3>Submit the permit application<\/h3>\n<p>Most renovations require a building permit prior to project start-up, as it is usually only the repair and maintenance works that are exempt from the permit.<\/p>\n<p>A permit application file must include the permit application form accompanied by other various documents that generally are:<\/p>\n<ul>\n<li>A copy of the certificate of location if the renovation includes an extension<\/li>\n<li>A detailed description of the works to be done<\/li>\n<li>A plan projecting the planned works<\/li>\n<li>Full contact details of the project manager and the contractor, if applicable<\/li>\n<li>An estimate of the cost of the work<\/li>\n<\/ul>\n<p>Fees are payable upon the deposit of the permit application: they varies according to borough and can go from 200 $ to 3 000 $.<\/p>\n<p>The municipality sends within 5 days of the permit application the declaration of the works to the R\u00e9gie du b\u00e2timent. It also informs the Commission de la construction du Qu\u00e9bec and Revenu Qu\u00e9bec. It should also be noted that the regulations applying to renovations vary from one borough to another. Depending on the municipality, the state of preparation and the complexity of the file, the permit application demand can takes from one day to six months.<\/p>\n<h3>The customer care service: a precious help<\/h3>\n<p>Some contractors offer a complete service including the procedures with the municipal services. Once the sketch and budget are accepted by the client, they establish the plans and specifications that will be used to submit the permit application. They take care of filling out the form, to submit the permit application with all the required documents, and follow its progress. During the the processing of the request by the municipality, the company meets with the client to choose the finishing materials in order to be able to start the work as soon as the permit is obtained. As soon as it is issued, a new appointment is established with the client to establish a schedule of work and a billing schedule.<\/p>\n<h3>The display of the permit<\/h3>\n<p>Once the permit has been obtained, and throughout the entire project, the permit issued by the municipality must be displayed prominently on the construction site. A municipal inspector may at any time do control visits of the site to ensure that the work is carried out in accordance with the documents and plans contained in the permit file.<\/p>\n<p>It is essential to detain the renovation permit before the start of the project, as work performed without a permit can leads to significant costs, with fines ranging from $ 350 to $ 4,000. In addition, a request for a minor exemption is not accepted for work done without a permit. As for work that does not require a permit, they still require a declaration of work to inform the municipality of the changes made to the property.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Depending on the size of the project, it may be necessary to obtain a works permit before starting the renovation of his house. In Quebec, the steps are taken with the municipality. A procedure that you can follow yourself or delegate to your contractor. Have plans and estimates ready As the application for a permit [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":30895,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"<p><span style=\"font-weight: 400;\">En fonction de l\u2019ampleur du projet, il faut parfois obtenir un permis pour travaux avant de commencer la r\u00e9novation de sa maison. Au Qu\u00e9bec, les d\u00e9marches s\u2019effectuent aupr\u00e8s de la municipalit\u00e9. Une proc\u00e9dure qu\u2019il est possible de suivre soi-m\u00eame ou de d\u00e9l\u00e9guer \u00e0 son entrepreneur. <\/span><\/p><h3><span style=\"font-weight: 400;\">Faire r\u00e9aliser des plans et des soumissions<\/span><\/h3><p><span style=\"font-weight: 400;\">Comme le d\u00e9p\u00f4t de demande de permis doit notamment \u00eatre accompagn\u00e9 de plans et d\u2019une estimation du co\u00fbt des travaux, il est indispensable de d\u00e9finir un projet clair, de faire r\u00e9aliser des plans correspondants et d\u2019obtenir une \u00e9valuation des travaux afin de disposer de l\u2019ensemble des renseignements et pi\u00e8ces qui doivent \u00eatre annex\u00e9s au d\u00e9p\u00f4t de demande de permis. <\/span><\/p><h3><span style=\"font-weight: 400;\">D\u00e9poser la demande de permis<\/span><\/h3><p><span style=\"font-weight: 400;\">La plupart des travaux de r\u00e9novation n\u00e9cessitent l\u2019obtention d\u2019un permis de construction avant le lancement du projet puisque ce sont g\u00e9n\u00e9ralement seulement les travaux de r\u00e9paration et d\u2019entretien qui sont exempt\u00e9s de permis.<\/span><\/p><p><span style=\"font-weight: 400;\">Le dossier de demande de permis doit comporter un formulaire de demande de permis accompagn\u00e9 de diff\u00e9rentes pi\u00e8ces qui sont en r\u00e8gle g\u00e9n\u00e9rale\u00a0:<\/span><\/p><ul><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Une copie du certificat de localisation si la r\u00e9novation int\u00e8gre un agrandissement<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Une description d\u00e9taill\u00e9e des travaux \u00e0 effectuer<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Un plan projetant les travaux pr\u00e9vus<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Les coordonn\u00e9es compl\u00e8tes du ma\u00eetre d\u2019\u0153uvre et de l\u2019entrepreneur s\u2019il y a lieu<\/span><\/li><li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Une \u00e9valuation du co\u00fbt des travaux<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">Des droits sont \u00e0 r\u00e9gler lors du d\u00e9p\u00f4t de permis\u00a0: ils sont variables selon les arrondissements et peuvent aller de 200\u00a0$ \u00e0 3\u00a0000\u00a0$.<\/span><\/p><p><span style=\"font-weight: 400;\">La municipalit\u00e9 transmet dans les 5 jours de la demande de permis la d\u00e9claration de travaux \u00e0 la R\u00e9gie du b\u00e2timent. Elle en informe \u00e9galement la Commission de la construction du Qu\u00e9bec et Revenu Qu\u00e9bec.<\/span><\/p><p><span style=\"font-weight: 400;\">Il faut savoir \u00e9galement que les r\u00e8glements s\u2019appliquant \u00e0 la r\u00e9novation varient d\u2019un arrondissement \u00e0 l\u2019autre. En fonction de la municipalit\u00e9, de l\u2019\u00e9tat de pr\u00e9paration et de la complexit\u00e9 du dossier, l\u2019instruction du permis peut durer d\u2019une journ\u00e9e \u00e0 six mois. <\/span><\/p><h3><span style=\"font-weight: 400;\">Le service de prise en charge du client\u00a0: une aide pr\u00e9cieuse<\/span><\/h3><p><span style=\"font-weight: 400;\">Certains entrepreneurs offrent un service complet incluant les d\u00e9marches aupr\u00e8s des services municipaux. Une fois l\u2019esquisse et le budget accept\u00e9s par le client, ils \u00e9tablissent les plans et les devis qui serviront pour d\u00e9poser la demande de permis. Ils s\u2019occupent de remplir le formulaire, de d\u00e9poser le dossier de demande aupr\u00e8s des services municipaux en joignant les documents requis, et de suivre son avancement. Pendant l\u2019instruction du dossier par le service d\u2019urbanisme de la municipalit\u00e9, l\u2019entreprise rencontre le client pour choisir les mat\u00e9riaux de finitions afin d\u2019\u00eatre en mesure de commencer les travaux d\u00e8s l\u2019obtention du permis. D\u00e8s celui-ci \u00e9mit, un nouveau rendez-vous est \u00e9tabli avec le client pour \u00e9tablir un calendrier des travaux et une s\u00e9quence de facturation. <\/span><\/p><h3><span style=\"font-weight: 400;\">L\u2019affichage du permis<\/span><\/h3><p><span style=\"font-weight: 400;\">Une fois le permis obtenu, et tout au long de la r\u00e9alisation du projet, le permis d\u00e9livr\u00e9 par la municipalit\u00e9 doit \u00eatre affich\u00e9 bien en vue sur le chantier. L\u2019inspecteur municipal peut \u00e0 tout moment effectuer des visites de contr\u00f4le sur le chantier afin de s\u2019assurer que les travaux sont r\u00e9alis\u00e9s conform\u00e9ment aux documents et aux plans figurant dans le dossier de permis.<\/span><\/p><p><span style=\"font-weight: 400;\">Il est primordial de d\u00e9tenir le permis de r\u00e9novation avant le commencement du chantier, car les travaux ex\u00e9cut\u00e9s sans permis engendrent des frais importants, avec des amendes allant de 350 \u00e0 4\u00a0000\u00a0$. En outre, une demande de d\u00e9rogation mineure n\u2019est pas recevable pour les travaux effectu\u00e9s sans permis. Quant aux travaux ne n\u00e9cessitant pas de permis, ils n\u00e9cessitent tout de m\u00eame de remplir une d\u00e9claration de travaux afin d\u2019informer la municipalit\u00e9 des modifications apport\u00e9es \u00e0 la propri\u00e9t\u00e9.<\/span><\/p>","_et_gb_content_width":"","iawp_total_views":37,"footnotes":""},"categories":[30,31],"tags":[],"class_list":["post-31256","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-house-transformation-expansion-tips","category-articles-recents-en"],"_links":{"self":[{"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/31256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/comments?post=31256"}],"version-history":[{"count":0,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/posts\/31256\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media\/30895"}],"wp:attachment":[{"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/media?parent=31256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/categories?post=31256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maxconstruction.qc.ca\/en\/wp-json\/wp\/v2\/tags?post=31256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}